The Latest Work

old paint in master bedroom, 2nd apartment

apartment during inspection

bathroom during inspection

during inspection

basement bathroom during inspection

office in 2nd apartment during inspection

Permaseal working on basement

previous tile

old garage

garage roof

bye-bye, garage

slab for new garage

Mary can't take the mess any longer!

looking better....

soon to be second bedroom

storage and laundry space

Trying to relax on a chilly spring evening

the view from the roof-top deck

Bella inspecting the yard that has become a garbage dump

new garage

new lights

interior of garage

completed garage

old roof-top deck lights

new roof-top deck lights

our house is a Station of the Cross?

tree branches, and 'alley helper'

new doors and light

new knobs

new knobs

Mary believes fresh air is important to your health!

Toto toilets with soft-close

door stops

finished hallway

finished downstairs bathroom

fixtures and shower

New Yorker Magazine font address numbers

special finish by Vidvuds, artist from gallery

Mary's paint job in bathroom

new mirror

new mirror in master bathroom

finished back gate, wrought iron....it can take a bullet!

deadbolt matches all gates and house keys

solar powered light installed in front to illuminate address numbers (grass needs to be cut)

front steps freshly painted....dirty from recent rain

freshly painted doors

finished paint job in apartment 1. Awaiting floor sanding

great room of apartment 1

painting in process of master bedroom of apartment 1

Mary let the dogs out!

new gutters, ala bro-in-law Greg, aka Spiderman

vent installed along peak of roof (Greg's work)

gutters

bedroom under siege

mostly finished laundry room (painted floors and walls, installed shelving and new lighting, moved sump pump battery, and new washer/dryer)

vacuumed crawl space

wireless garage door monitor (green means closed, bliking red means open)

Bella sat in red paint

completed master bedroom bathroom of apartment 2 (new mirror, proper lightbulbs, special finish paintjob)

completed master bedroom bathroom of apartment 2 (toilet paper roll, hooks, Toto toilet)

sanded and finished floor....all we need is the basketball hoop!

before

after

rasberry parfet paint

Klackbo chairs from Ikea (putting them together was a bunch of crapbo)

chalkboard paint near kitchen

office in basement......everything is from Ikea

basement bathroom with accessories and shower curtain

argh, matey, the treasure is in that thar basement!

new deck without railing

two steps up and 14" higher due to unlevel ground and other complications

Home Depot was out of lattice, so that will be added on at a later date.

basil, oregano and thyme sunning themselves on lookout deck

native prarie grasses planted under stairs

planters along deck make a nice pseudo railing

filling in the holes

hose

planters in front of house

grass seed

great room is shaping up!

bedroom is almost there

the office is pretty swell

cardboard art gun in office

hallway with art

cupcakes in second bedroom

cupcakes on wall

new cell phones

all we're missing is the couch

the Dali's in new frames

pot rack with chalkboard paint on wall

Mary organizes her many purses

bedside tables

Mary presents

mmmm, tasty slipper!

hey, who ate my Care Bear's face?!

.....I dunno

tie rack

storage bench

finally, a bed she can jump up on

spice drawer

hutch with crystal

china and linen below

yuck!

presents previous tenent left behind

Mary likes to clean

blinds in basement

blinds in great room

open blinds

blinds in second apartment

closed blinds in second apartment

view of house with improvements

Mr. Owl will aswer how many licks it takes to get to the center of a tootsie roll lollipop

blind on back porch, ground floor

finished floor in 2nd apartment

deck blind for 2nd apartment

office / second bedroom new paint

office / second bedroom new paint

covered floor....ready for painting

Mr. Owl is on patrol!

new carpet

The inspector is pleased

The inspector is remains pleased

all thats left is Closetworks

not such a bad place to take a spill, anymore!

ten hours later.....

Owls?! We don't need no stinkin owls!

Flor tiles installed to protect wood floor from spills in kitchen. Individual tiles can be removed and replaced.

Special finish wall in upper apartment.

close up of special finish. Very suede like

ceiling looks great!

closet doors installed with nice knobs

new closet

jewelry drawer

shoe storage

lattice installed....almost done. All I have to do is install top border trim

storage area on far side of deck. Hose and garden buddy can go here during winter

extra stability support for 'look out' deck

support straps